PhotoLog inStart

Commercial bid calculator

How does a commercial bid add up?

The markups on a commercial bid do not all apply to everything. Fringe sits on crew labor, the production fee on production costs but not the director's fee, insurance on most sections, and post carries its own markup.

Put in five amounts and your rates and see where each one lands, worked out by the same engine ACTUALS uses for every AICP-format top sheet.

Build the top sheet

Prep and shoot crew wages, before fringe (A, B)

Locations, studio, art, equipment, media (C to K)

Creative fees (L): no fee or insurance on them

Flights, hotels, per diems (O): insurance only

Editorial, audio, finishing (Q to W)

Crew labor
$40,000.00
Fringe
$14,000.00
Production expenses
$60,000.00
Director's fees
$25,000.00
Travel
$8,000.00
Production subtotal
$147,000.00
Insurance
$2,440.00
Production fee
$25,080.00
Production total
$174,520.00
Post
$20,000.00
Post markup
$3,000.00
Post insurance
$400.00
Post total
$23,400.00
Grand total
$197,920.00

What each markup applies to

  • Fringe on crew labor only: the payroll taxes and benefits on wages. See production budget fringes.
  • Production fee on crew and production expenses (sections A to K). Not on the director's fee, travel or post in this layout.
  • Insurance on crew, production expenses and travel, and on post at the post rate. Not on the director's fee.
  • Post markup on post costs, apart from the production fee.

This follows the flags in the ACTUALS AICP-format template. A real bid can set them section by section; in ACTUALS each one is a setting. More on how they stack: production fee and markups.

A worked example

The calculator starts with crew of 40,000, production expenses of 60,000, a director's fee of 25,000, travel of 8,000 and post of 20,000, at 35% fringe, a 22% production fee, 2% insurance and a 15% post markup:

  • Fringe: 35% of 40,000 is 14,000.
  • Production subtotal: 54,000 + 60,000 + 25,000 + 8,000 = 147,000.
  • Insurance: 2% of 122,000 (everything but the director's fee) is 2,440.
  • Production fee: 22% of 114,000 (crew and expenses) is 25,080.
  • Production total: 174,520. Post: 20,000 + 3,000 markup + 400 insurance = 23,400.
  • Grand total: 197,920.

From five numbers to a full bid

Every number here is a section on a real bid. Start from the AICP budget template and the sections, lines and markups are already laid out; read the top sheet the same way the agency will.

Questions

Not in the standard AICP layout: the director's fee (section L) carries no production fee or insurance. Your agreement with the agency may differ, and ACTUALS lets you change it section by section.

Three budgets free. Every feature, no card.

Start a budget