What each markup applies to
- Fringe on crew labor only: the payroll taxes and benefits on wages. See production budget fringes.
- Production fee on crew and production expenses (sections A to K). Not on the director's fee, travel or post in this layout.
- Insurance on crew, production expenses and travel, and on post at the post rate. Not on the director's fee.
- Post markup on post costs, apart from the production fee.
This follows the flags in the ACTUALS AICP-format template. A real bid can set them section by section; in ACTUALS each one is a setting. More on how they stack: production fee and markups.
A worked example
The calculator starts with crew of 40,000, production expenses of 60,000, a director's fee of 25,000, travel of 8,000 and post of 20,000, at 35% fringe, a 22% production fee, 2% insurance and a 15% post markup:
- Fringe: 35% of 40,000 is 14,000.
- Production subtotal: 54,000 + 60,000 + 25,000 + 8,000 = 147,000.
- Insurance: 2% of 122,000 (everything but the director's fee) is 2,440.
- Production fee: 22% of 114,000 (crew and expenses) is 25,080.
- Production total: 174,520. Post: 20,000 + 3,000 markup + 400 insurance = 23,400.
- Grand total: 197,920.
From five numbers to a full bid
Every number here is a section on a real bid. Start from the AICP budget template and the sections, lines and markups are already laid out; read the top sheet the same way the agency will.